A findings register
Every gap, inconsistency and weak document, listed against the clause or requirement it fails. Not a general impression — a numbered list someone can work through.
They contradict themselves. A model list that grew after testing, a laboratory outside its accreditation scope, three documents naming the manufacturer three different ways. We read the file the way a conformity body will, and tell you what it will say — while you can still do something about it.

To review a file we need:
Exporters tend to assemble technical files as collections: a certificate here, a report there, whatever the supplier sent. Each item is real, and the folder looks convincing. What decides the outcome is something narrower — whether each document is still live, whether its issuer was competent for that specific test, whether its scope covers the product you are actually selling, and whether the documents agree with each other about what that product is.
A conformity body applies those tests in a few hours. The difference is that when they apply them, the answer arrives as a query on their timetable, with a shipment behind it. This review applies the same tests first.
A review that returns an impression is not worth commissioning. Six things come back, and all of them are actionable.
Every gap, inconsistency and weak document, listed against the clause or requirement it fails. Not a general impression — a numbered list someone can work through.
What will stop the application, what will draw a query, and what is untidy but survivable. The three are treated very differently and conflating them wastes money.
Where evidence is missing, we say which standard and which clauses, so you can quote it. We do not send you back to a laboratory for a full programme you may not need.
Which items block others, which can run in parallel, and what the realistic order is. The order is usually worth more than the list.
A plain answer on whether the file is ready for a conformity body today, and if not, what the shortest path to ready looks like.
Findings go back to the engineer, the supplier or the agent who owns them, in language they can act on rather than as a forwarded PDF.
Five steps, in this order. The first one is the step most self-assessments skip, and skipping it makes the rest meaningless.
A file cannot be assessed in the abstract. We take the Saudi HS code, identify the technical regulation and the standards it names, and establish the edition in force. Everything after this is measured against that, not against general good practice.
Certificates, reports, drawings, declarations, artwork, component lists. Listed as documents with dates, issuers and scope — which is usually the first time anyone has seen the file as a whole.
Is it live, is the issuer competent for this, does its scope cover the product, is the edition current, does it name the right manufacturer. A document can be genuine and still carry none of the weight it is being asked to carry.
Model names, ratings, manufacturer addresses and product descriptions compared across every document. Most rejected files are not missing anything — they contradict themselves.
We describe what is needed to pass, with severity and sequence. A review that returns a wish list is a review that gets ignored.
Send what you have, including the parts you suspect are weak. A review of an edited file reviews the editing.
Six patterns that account for most of what a technical review turns up, across every product family we handle.

Testing that was correct when it was done and is no longer measured against the standard in force. Common on files assembled over several years.
A genuinely accredited laboratory reporting against a standard outside its scope annexe. The certificate on the wall does not make every report usable.
The range grew after testing. Variants that need a justified family grouping or their own evidence, rather than an assumption that they are covered.
A trading name on the invoice, a legal entity on the certificate and a plant on the report. All correct, none matching, and the file reads as three products.
A declaration of conformity citing standards nothing in the file supports. It is the single easiest thing for an assessor to disprove.
Ratings on the nameplate that no report demonstrates, or a mark the product is not entitled to carry. Cheap to correct on artwork, expensive once tooling is cut.
Nothing in the left column is easier than the right. It is the same defect — the only difference is who found it and when.
A review is not an annual ritual. These are the points where a file changes underneath you.
A file built for another market, being pointed at a Saudi regulation for the first time. The overlap is usually large and never complete.
One query is a document problem. Three is a file problem, and answering them one at a time is the slowest way to resolve it.
A second source, a moved line or a new contract manufacturer. The evidence still describes the old arrangement.
New variants added since certification, and no one has established whether the family grouping still holds.
Standards move between certificate cycles. A renewal is the cheapest moment to discover that, and the worst one to be surprised by it.
A supplier or trading partner has supplied the dossier. Reviewing it before you rely on it is ordinary diligence.
A machinery exporter with an eleven-year-old product line, a dossier assembled from three suppliers, and a conformity body query already open.
The HS code put the range under a regulation naming two standards. One of them had moved edition twice since the newest report in the file.
Thirty-one documents, four of them duplicates, two of them drafts that had never been finalised, and one report belonging to a product they no longer sold.
Two reports came from a laboratory whose accreditation scope did not cover the standard cited. They looked like the strongest evidence in the file and carried no weight at all.
The manufacturer appeared under three names across the documents. One entity was named, the rest were reissued or annotated with a documented relationship.
Delta testing on nine clauses instead of a full reassessment, the open query answered in a single response, and the certificate issued without a further round.
Six conditions. A file that meets all six is ready for a conformity body; a file that misses one is ready for a query.
What belongs in a file, how the evidence behind it is judged, and the later check that protects the shipment.
Scope, turnaround and what happens to the findings.
It is an assessment of your technical file against the Saudi regulation that will actually be applied to it, carried out before you submit to a conformity assessment body. The output is a findings register: what is missing, what is weak, what will draw a query, and in what order to fix it.
A pre-shipment review checks the documents for one consignment against that shipment, shortly before it moves. This checks the technical file behind the product against the regulation, much earlier. One protects a container, the other protects a certification programme.
The requirements are published, and we set them out on the requirements page. What is hard is not knowing the list — it is judging whether a specific report, issued by a specific laboratory, against a specific edition, actually covers the product you are selling. That judgement is the service.
Then you submit with more confidence than you had, and the review cost a fraction of one delayed shipment. It happens, most often with manufacturers who have certified into demanding markets before. It is not the common outcome on a first Saudi file.
The full reports. Summary pages tell you a product passed; the body of the report tells you what was tested, in what configuration, against which clauses, at which laboratory. Almost every substantive finding we make comes from the part of the report that summaries leave out.
Not really, and that is itself a finding. A conformity body will need to assess the evidence, so a report you cannot obtain is a report you cannot rely on. There are routes — direct release to the assessor, a confidentiality undertaking, or the supplier holding the certificate themselves — and choosing between them early is far better than discovering the problem at submission.
It depends on the size of the file rather than the complexity of the product. A single product with a tidy dossier is quick; a range assembled from several suppliers over a decade takes longer to inventory than to assess. We give you a turnaround when we see what is in the file.
We will scope and coordinate the work — naming the testing, briefing the laboratory, reconciling the documents and taking the file through to certification if you want that. The review itself is deliberately separable, because some clients only need to know where they stand.
No, and anyone promising that is describing something other than an independent review. What it does is remove the failures that are knowable in advance, which is most of them. The conformity body still makes its own assessment.
That is one of the better moments for it. Queries tend to arrive one at a time, and answering them individually means several rounds, each costing a week. Reviewing the whole file at that point usually reveals the remaining queries before they are asked, and they can be answered together.
Send the file as it stands, the model list and the HS code. You get back a numbered findings register, a severity call on each item, and a plain answer on whether it is ready to submit.